SUBCONTRACT PACKAGES
UNDER CONTRACT SANRAL N.003-010-2017/9 FOR THE CAPACITY IMPROVEMENTS ON N3 SECTION1 FROM WESTVILLE VIADUCT (KM11.8) TO PARADISE VALLEY INTERCHANGE (KM 17.57)
T1.1 TENDER NOTICE AND INVITATION TO TENDER (SBD1)
AQUAEXR JV (PTY) LTD invites tenders from experienced EME/QSE subcontractors for the Construction of Work Packages as detailed below for THE CAPACITY IMPROVEMENTS ON N3 FROM WESTVILLE VIADUCT (KM11.8) TO PARADISE VALLEY INTERCHANGE (KM17.57) endorsed by The South African National Roads Agency SOC Limited (SANRAL). This project is in the province of KwaZulu Natal in the district municipality of EThekwini Metro Municipality.
Only tenderers who comply with the definition of a Targeted Enterprise under clause 2.1.1 and are at least 51% Black owned and who is an EME or QSE or a cooperative, are eligible to tender.
Only tenderers who meet the minimum functionality score as stated in clause C3.11.1 will be evaluated further on price and preference. It is estimated that tenderers should have a CIDB contractor grading designation as indicated in the table below. There is NO Compulsory Tender Clarification meeting and The Tender Briefing Presentation can be downloaded on the link below: (https://1drv.ms/f/s!AgwkV93iNPul9Epm7nJOmK5vm1c1?e=2FwmZR)
|
TENDER PACKAGE NUMBER |
TENDER DESCRIPTION |
CIDB |
Duration |
Target group |
Submission of tender Documents 39 Alexander Road Westmead Pinetown Kwazulu Natal |
|
|
N003-10-2017/9 CPG-067 |
Construction of Insitu Concrete Culvert CL408 Outlet on N3 Westville Viaduct at KM 14.665 |
Grade 2CE |
3 Months |
+51% Black owned |
Date |
Time |
|
09/04/2026
|
13.00 PM |
|||||
|
N003-10-2017/9 CPG-068 |
Construction of Concrete Canel 1 on N3 East Bound Between Langford and Langcaster Bridge |
Grade 4CE |
6 Months |
+51% Black owned |
13/04/2026
|
13.00 PM |
|
N003-10-2017/9 CPG-069 |
Construction of Concrete Canel 2 on N3 West Bound Between Langford and Langcaster Bridge |
Grade 3CE |
4 Months |
+51% Black owned |
13/04/2026
|
13.00 PM |
|
N003-10-2017/9 CPG-070 |
N3 Steel Reinforcing Supply and Fix on The Deck Segment 1 of Bridge No. B0169: Paradise Valley Interchange - Ramp A on M13 (KM 0.38) |
Grade 2CE |
1 Months |
+51% Black owned |
09/04/2026
|
13.00 PM |
|
N003-10-2017/9 CPG-071 |
N3 Steel Reinforcing Supply and Fix on The Deck Segment 2 of Bridge No. B0169: Paradise Valley Interchange - Ramp A on M13 (KM 0.38) |
Grade 2CE |
1 Months |
+51% Disability owned |
09/04/2026
|
13.00 PM |
|
N003-10-2017/9 CPG-072 |
Construction of Non-Structural Gabions on N3/M13 Paradise Valley Interchange |
Grade 2CE |
4 Months |
+51% Black owned |
09/04/2026
|
13.00 PM |
|
N003-10-2017/9 CPG- 073 |
Material Haulage and Backfilling Behind Bridge Structures on N3 Westville Viaduct to Paradise Valley 1CE P1 |
Grade 1CE |
2 Months |
+51% Disability owned |
09/04/2026
|
13.00 PM |
|
N003-10-2017/9 CPG-074 |
Material Haulage and Backfilling Behind Bridge Structures on N3 Westville Viaduct to Paradise Valley 1CE P2 |
Grade 1CE |
2 Months |
+51% Youth Owned |
09/04/2026
|
13.00 PM |
|
N003-10-2017/9 CPG-075 |
Construction of Reinforced Concrete Fill Walls W356 and W357 on N3 OnRamp at KM 17,3 RHS
|
Grade 4CE |
5 Months |
+51% Black owned |
13/04/2026
|
13.00 PM |
|
N003-10-2017/9 CPG-076 |
Construction of Reinforced Concrete Fill Wall W367 At KM 16,3 Between Dudly Road and Paradise Valley Viaduct |
Grade 4CE |
4 Months |
+51% Black owned |
13/04/2026
|
13.00 PM |
|
N003-10-2017/9 CPG-077 |
Construction of MSE Wall W21001 on M13 Eden Road |
Grade 2CE |
3 Months |
+51% Black owned |
09/04/2026
|
13.00 PM |
|
N003-10-2017/9 CPG-078 |
Construction of MSE Wall W289 on M13 Eden Road |
Grade 6CE |
5 Months |
+51% Black owned |
13/04/2026
|
13.00 PM |
|
N003-10-2017/9 CPG-079 |
Construction of Non-Structural Gabions on N3 Near Westville Viaduct |
Grade 1CE |
3 Months |
+51% Disability owned |
15/04/2026
|
13.00 PM |
|
N003-10-2017/9 CPG-080 |
Construction of Parapets on MSE Wall W0333 on Ramp D St James Interchange P1 |
Grade 2CE |
3 Months |
+51% Black owned |
15/04/2026 |
13.00 PM |
|
N003-10-2017/9 CPG 081 |
Construction of Parapets on MSE Wall W0333 on Ramp D St James Interchange P2 |
Grade 2CE |
3 Months |
+51% Disability owned |
15/04/2026 |
13.00 PM |
|
N003-10-2017/9 CPG-082 |
Supply and Fix Parapet Reinforcing on MSE Wall W0333 on Ramp D St James Interchange P1 |
Grade 2CE |
3 Months |
+51% Disability/ Women owned |
15/04/2026 |
13.00 PM |
|
N003-10-2017/9 CPG-083 |
Supply and Fix Parapet Reinforcing on MSE Wall W0333 on Ramp D St James Interchange P2 |
Grade 2CE |
3 Months |
+51% Black owned |
15/04/2026
|
13.00 PM |
|
N003-10-2017/9 CPG-084 |
Construction of Parapets on MSE Wall W0334 on Ramp D St James Interchange |
Grade 5CE |
5 Months |
+51% Black owned |
13/04/2026
|
13.00 PM |
|
N003-10-2017/9 CPG-085 |
Supply and Installation of Protective Coatings and Treatments for Concrete on MSE Wall W316 |
Grade 1CE |
3 Months |
+51% Black owned |
15/04/2026
|
13.00 PM |
|
N003-10-2017/9 CPG-086 |
Supply and Installation of Protective Coatings and Treatments for Concrete on MSE Wall W322 |
Grade 2CE |
4 Months |
+51% Black owned |
15/04/2026
|
13.00 PM |
|
N003-10-2017/9 CPG-087 |
Clear and Grub on N3 Between Westville Viaduct to Paradise Valley |
Grade 1CE |
6 Months |
+51% Women owned |
15/04/2026 |
13.00 PM |
|
N003-10-2017/9 CPG-088 |
Supply and Installation of Protective Coatings and Treatments for Concrete on MSE Wall W332 |
Grade 2CE |
4 Months |
+51% Black owned |
17/04/2026
|
13.00 PM |
|
N003-10-2017/9 CPG-089 |
The Construction of Parapet on MSE Wall W336 and 327 on N3 On-Ramp (St James Interchange) |
Grade 6CE |
5 Months |
+51% Black owned |
17/04/2026
|
13.00 PM |
|
N003-10-2017/9 CPG-090 |
Supply and Installation of Concrete Copping and F-Shape Concrete Barriers on Cut Walls on M13 Interchange |
Grade 6CE |
6 Months |
+51% Black owned |
17/04/2026
|
13.00 PM |
|
N003-10-2017/9 CPG-091 |
Construction of Storm Water Drainage on N3 Paradise Valley Outer Median |
Grade 5CE |
6 Months |
+51% Black owned |
17/04/2026
|
13.00 PM |
The tenderers attention is drawn to clause 2.1.1 of the Tender Data for each work package when submitting their tender.
Tenders from tenderers registered as potentially emerging enterprises but with a CIDB contractor grading designation lower than a contractor grading designation determined in accordance with the sum tendered, or a value determined in accordance with Regulation 25(7A) of the Construction Industry Development Regulations, will not be accepted.Only locally produced or locally manufactured goods with a stipulated minimum threshold for local content and production as stated in the Tender Data will be considered. Preference is offered to tenderers who comply with the criteria stated in the Tender Data.
SUBCONTRACT TENDER DOCUMENTS
Tender documents are available at no cost in electronic format via e-mail or the following link. (https://1drv.ms/f/s!AgwkV93iNPul9Epm7nJOmK5vm1c1?e=2FwmZR)
Prospective tenderers may send a request or queries to the following address shane@lionbee.co.za.
Tenderers must have access to Microsoft Office © 2013 and Acrobat Adobe ©9.0, or similar compatible software. As per table above and stipulated dates all advertised packages will have a prerecorded/ powerpoint tender briefing uploaded via the link above.
COMPLETION AND DELIVERY OF TENDERS
The closing time for receipt of tenders will be as per above table at 39 Alexander Road Westmead Pinetown KZN.
Telegraphic, telephonic, telex, email, facsimile, and late tenders will not be accepted.
Tender documents to be deposited into the tender box situated at 39 Alexander Road Westmead Pinetown KZN. 29°49’07.00” S. 30°50’00.00” E.
Tenders may only be submitted in the format as stated in the Tender Data.
Queries relating to issues arising from these documents may be addressed to the following:
|
Enquiries |
|
Contact person : Mr. Shane Pillay |
|
|
|
E-mail : shane@lionbee.co.za |